Inspector data-entry wizard for the room-readiness checklist. Identify the building and room, confirm each of the 25 fixture / fabric checkpoints, and sign off with your name, email, and inspection date and time. There is no clinical grading here — just a tally of what is confirmed and what still needs attention.